Resource Type

Journal Article 362

Conference Videos 7

Year

2023 26

2022 27

2021 27

2020 30

2019 26

2018 20

2017 28

2016 13

2015 16

2014 7

2013 17

2012 11

2011 17

2010 9

2009 13

2008 13

2007 17

2006 20

2005 5

2004 1

open ︾

Keywords

different 7

simulation 4

China 3

temperature 3

Accelerated aging test 2

Adaptive dynamic programming 2

Around corners 2

BIM 2

Boolean control networks 2

LED lamp 2

Medium lifetime 2

Moving average error 2

Time delay 2

construction time 2

performance evaluation 2

scheduling 2

time series 2

time series analysis 2

(R)-(+)-1(1-naphthyl)ethylamine 1

open ︾

Search scope:

排序: Display mode:

Controller area network node reliability assessment based on observable node information Article

Lei-ming ZHANG, Long-hao TANG, Yong LEI

Frontiers of Information Technology & Electronic Engineering 2017, Volume 18, Issue 5,   Pages 615-626 doi: 10.1631/FITEE.1601029

Abstract: In this paper, a novel CAN node reliability assessment method, which uses node’s time to bus-off as theFinally, a node reliability assessment method is developed to predict the time to reach bus-off state

Keywords: Controller area network (CAN)     Transmit error counter (TEC)     TEC value estimation     Bayesian network     Bus-offhitting time    

Study and Performance Analysis of TT - FPS Based on CAN Bus

Lu Weijie,Liu Luyuan,Wang Yixin

Strategic Study of CAE 2006, Volume 8, Issue 5,   Pages 45-48

Abstract:

Message transmission of CAN bus fixed priority static scheduling algorithm ( FPS) is unpredictableTo solve these problems, a new fixed priority scheduling based on time-triggered architecture (TT - FPS) is presented, and the approach for calculating the worst-case response time of TT - FPS is given.

Keywords: CAN bus     TT-FPS     the worst-case response time    

Simulation on Hitting Probability of MMW Remote ControllingTrajectory Correction Munition Intercepting

Hu Ronglin,Li Xingguo

Strategic Study of CAE 2007, Volume 9, Issue 6,   Pages 48-52

Abstract: theory and method of schedule management,  tunnel engineering construction schedule S curve real time

Keywords: visual simulation     tunnel construction     optimization analysis     real time control    

Erratum to: Determination of cut-off time of accelerated aging test under temperature stress for LED

Jian Hao, Lei Jing, Hong-liang Ke, Yao Wang, Qun Gao, Xiao-xun Wang, Qiang Sun, Zhi-jun Xu,sunq@ciomp.ac.cn

Frontiers of Information Technology & Electronic Engineering 2017, Volume 18, Issue 10,   Pages 1678-1678 doi: 10.1631/FITEE.15e0483

Abstract: Erratum to: , 2017 18(8):1197-1204. doi:

Keywords: LED lamp     Accelerated aging test     Medium lifetime     Moving average error    

Lightweight design of an electric bus body structure with analytical target cascading

Frontiers of Mechanical Engineering 2023, Volume 18, Issue 1, doi: 10.1007/s11465-022-0718-y

Abstract: In this study, a lightweight design of a newly developed multi-material electric bus body structure is

Keywords: electric vehicle     body in white (BIW)     lightweight     analytical target cascading (ATC)    

Advanced purification and comprehensive utilization of yellow phosphorous off gas

Ping NING,Xiangyu WANG

Frontiers of Environmental Science & Engineering 2015, Volume 9, Issue 2,   Pages 181-189 doi: 10.1007/s11783-014-0698-1

Abstract: Without appropriate purification and removal, this off gas has potential to cause severe pollution problemsPurified yellow phosphorous off gas can be beneficially reused as a raw material in chemical productionIn this paper, the significance of purification and reutilization of yellow phosphorous off gas are exploredprocesses, and main characteristics of the technologies for purification and reuse of yellow phosphorus offcomprehensive reutilization can be an effective solution for heavy pollution resulting from yellow phosphorous off

Keywords: yellow phosphorous off gas     purification     comprehensive utilization    

Intelligent algorithm for optimal meter placement and bus voltage estimation in ring main distribution

L. RAMESH, N. CHAKRABORTY, S. P. CHOWDHURY

Frontiers in Energy 2012, Volume 6, Issue 1,   Pages 47-56 doi: 10.1007/s11708-011-0159-5

Abstract: The second stage is to estimate the bus voltage magnitude, where real time measurement is conducted and

Keywords: artificial intelligence     power distribution control     state estimation    

Typical off-design analytical performances of internal combustion engine cogeneration

Xiaohong HE, Ruixian CAI

Frontiers in Energy 2009, Volume 3, Issue 2,   Pages 184-192 doi: 10.1007/s11708-009-0007-z

Abstract: Based on experimental data, typical off-design characteristic curves with corresponding formulas of internalrecovery steam generator (HRSG) and influence of ambient pressure on combined heat and power (CHP) system, off-design

Keywords: internal combustion engine (ICE)     cogeneration     heat recovery steam generator (HRSG)     off-design     superheated    

Quantification of emission variability for off-road equipment in China based on real-world measurements

Frontiers of Environmental Science & Engineering 2022, Volume 16, Issue 2, doi: 10.1007/s11783-021-1455-x

Abstract:

• Emissions from 53 in-use diesel-fueled off-road equipment were measured

Keywords: Off-road equipment     Portable emission measurement system (PEMS)     Real-world emissions     Diesel engine    

Consolidating Bus Charger Deployment and Fleet Management for Public Transit Electrification: A Life-Cycle Article

Ziling Zeng, Shuaian Wang, Xiaobo Qu

Engineering 2023, Volume 21, Issue 2,   Pages 45-60 doi: 10.1016/j.eng.2022.07.019

Abstract: urban transit electrification, the progress of systematic planning and management of the electric bussystem are first reviewed, including charging  station  deployment, battery sizing, busafter the bus fleet and infrastructure have been deployed, resulting in low resource utilizationpropose a mixed-integer programming model to consolidate charging station deployment and busand charging station layout, the LCC of one bus line can be decreased significantly by 30.4%.

Keywords: Electric bus     Charging station deployment     Battery sizing     Bus scheduling     Life-cycle analysis    

Construction Technology of Off-Site Precast Concrete Buildings

Ting Gong,Jian Yang,Hao Hu,Feng Xu

Frontiers of Engineering Management 2015, Volume 2, Issue 2,   Pages 122-124 doi: 10.15302/J-FEM-2015039

Abstract: A comparison between traditional on-site and modern off-site construction methods has been conducted.

Keywords: off-site construction     precast concrete     modular construction     construction management     building information    

Development and application of an off-site maintenance system in the petrochemical industry

Ruisheng YONG, Yanbing YE, Hanbin LUO, Lieyun DING

Frontiers of Engineering Management 2017, Volume 4, Issue 2,   Pages 111-126 doi: 10.15302/J-FEM-2017027

Abstract: and exposure to hazards during on-site operations and thereby reduce the probability of accidents, off-site

Keywords: on-site maintenance     petrochemical industry     safety     off-site maintenance system    

active power filter system and its novel fault-tolerant strategy based on split-phase control and real-timebus communication None

Qun-wei XU, Jin-xiang ZHAN, Long XIAO, Guo-zhu CHEN

Frontiers of Information Technology & Electronic Engineering 2018, Volume 19, Issue 9,   Pages 1166-1179 doi: 10.1631/FITEE.1601296

Abstract: novel fault-tolerant approach is proposed based on split-phase control in the a-b-c frame and real-timebus communication.

Keywords: Shunt active power filter     Fault-tolerant topology     Split-phase control     Bus communication    

Optimization of urban bus operation frequency under common route condition with rail transit

Bin YU, Sijia REN, Enze WU, Yifan ZHOU, Yunpeng WANG

Frontiers of Engineering Management 2017, Volume 4, Issue 4,   Pages 451-462 doi: 10.15302/J-FEM-2017036

Abstract: The overlap of bus and rail transit routes is common in China.are becoming increasingly common, this paper aims to present the overlapped operation condition of busand rail transit using a bi-level model from the perspective of bus operators.Results show that as the overlapped optimization of bus route and rail transit routes changed primary, changed bus frequency would improve bus operations.

Keywords: common route     bus operation frequency     bi-level model     Agent simulation     SCE-UA algorithm    

Simulation on Hitting Probability of MMW Remote ControllingTrajectory Correction Munition Intercepting

Hu Ronglin,Li Xingguo

Strategic Study of CAE 2007, Volume 9, Issue 10,   Pages 65-70

Abstract:  Subsequently,  the hitting probability of single MMW-RCTCM vs.

Keywords: remote controlling     trajectory correction munitions     correctable intercepting flow     anti-ship missile     hitting    

Title Author Date Type Operation

Controller area network node reliability assessment based on observable node information

Lei-ming ZHANG, Long-hao TANG, Yong LEI

Journal Article

Study and Performance Analysis of TT - FPS Based on CAN Bus

Lu Weijie,Liu Luyuan,Wang Yixin

Journal Article

Simulation on Hitting Probability of MMW Remote ControllingTrajectory Correction Munition Intercepting

Hu Ronglin,Li Xingguo

Journal Article

Erratum to: Determination of cut-off time of accelerated aging test under temperature stress for LED

Jian Hao, Lei Jing, Hong-liang Ke, Yao Wang, Qun Gao, Xiao-xun Wang, Qiang Sun, Zhi-jun Xu,sunq@ciomp.ac.cn

Journal Article

Lightweight design of an electric bus body structure with analytical target cascading

Journal Article

Advanced purification and comprehensive utilization of yellow phosphorous off gas

Ping NING,Xiangyu WANG

Journal Article

Intelligent algorithm for optimal meter placement and bus voltage estimation in ring main distribution

L. RAMESH, N. CHAKRABORTY, S. P. CHOWDHURY

Journal Article

Typical off-design analytical performances of internal combustion engine cogeneration

Xiaohong HE, Ruixian CAI

Journal Article

Quantification of emission variability for off-road equipment in China based on real-world measurements

Journal Article

Consolidating Bus Charger Deployment and Fleet Management for Public Transit Electrification: A Life-Cycle

Ziling Zeng, Shuaian Wang, Xiaobo Qu

Journal Article

Construction Technology of Off-Site Precast Concrete Buildings

Ting Gong,Jian Yang,Hao Hu,Feng Xu

Journal Article

Development and application of an off-site maintenance system in the petrochemical industry

Ruisheng YONG, Yanbing YE, Hanbin LUO, Lieyun DING

Journal Article

active power filter system and its novel fault-tolerant strategy based on split-phase control and real-timebus communication

Qun-wei XU, Jin-xiang ZHAN, Long XIAO, Guo-zhu CHEN

Journal Article

Optimization of urban bus operation frequency under common route condition with rail transit

Bin YU, Sijia REN, Enze WU, Yifan ZHOU, Yunpeng WANG

Journal Article

Simulation on Hitting Probability of MMW Remote ControllingTrajectory Correction Munition Intercepting

Hu Ronglin,Li Xingguo

Journal Article